Description:
At this time, the Company proposes to develop approximately 40 percent of the Lease Area, an area located 12 in the northwest corner closest to shore (19,441 ha, referred to as the Wind Development Area). 13 Infrastructure in the Wind Development Area will include wind turbine generators (WTGs), inter-array 14 cables, and an electrical service platform (ESP). The Project will connect from the ESP through offshore 15 export cables (within a designated corridor) and onshore export cables to the new onshore substation in 16 Virginia Beach, Virginia, where the renewable electricity generated will be transmitted to the electric grid.
pdf
Publication Date:
Monday, April 26, 2021